Upon a drill reaches designed depth, concrete under pressure is being fed which prevents any soil from strewing down the opening, and simultaneously a pile is being formed and an auger is being pulled up. Upon concreting, depending on design requirements, cage reinforcement or steel profiles are being installed. Formed piling parameters are continuously monitored by a computer system.
We perform piles with diameters up to 1000 mm.
CFA piles are constructed for intermediate foundations of objects, being erected as well as for retaining walls and other protection structures according to the Client’s requirements.
An advantage of CFA piling is fast completion, as opposed to traditional drilled piles.